In 2011, provision of hangers to Airbus Group at Kobe Airport led us to expend overseas. In 2013, we established a local subsidiary to strengthen our business structure in response to strong overseas aviation demand. Today, we provide aviation-related facilities in Singapore and Canada, as well as finance simulator and engine leasing companies, and are steadily expanding our business.
Major Facilities
Airbus Asia Training Centre (Seletar Airport, Singapore)
A new office is staffed and opened in Singapore with
an aim to enhance local marketing ability and to gather overseas information for the entire AFC
Group.
2022
AFS PROPERTIES PTE. LTD.(AFS) conclude the financing contract
about aircraft engine procurement
Loanee: Total Engine Asset Management Pte. Ltd.
Signed an investment contract for an aircraft fund as a major investor
Fund operation company : Mercuria Investment Co., Ltd
2023
Installation of a solar power generation facility on the roof of the engine maintenance building at Seleter Airport
Installation Facility: Engine Maintenance Building at Seleter Airport Purpose : Electricity for in-house consumption Annual amount of power generation: 488,100kWh
Recent Project
Aircraft Fund
We signed an investment contract for an aircraft fund established and operated by Mercuria Investment Co., Ltd. as a major investor.
It is the first aircraft fund for domestic investors after occurrence of the COVID-19.
Solar Power Generation Business
Utilization of clean energy is a first step towards realizing a sustainable society. We are making efforts in the “Solar Power Generation Business”, utilizing the rooftops of facilities in and outside the airport as well as idle land. Since establishing a solar power plant in Narita City, Chiba Prefecture in 2013, we have been able to supply about 5.58 million kWh of electricity annually, equivalent to electricity consumption for about 1,420 households. We will continuously contribute to achieving the SDGs through the utilization of renewable energy.
Installing megawatt-class photovoltaic power
generation facility in Haneda Airport
Megawatt-class photovoltaic power generation panels are installed in the
domestic cargo terminal of our company. We are introducing clean energy by generating
electricity equivalent to the consumption of about 300 households annually, and self-consume the
electricity generated within the area.
A photovoltaic power generation facility owned by our company annually
generates electricity equivalent to about 2,710t emission of CO2 in total. We will continuously
contribute to the reduction of CO2 emission through investment in renewable energy.
Domestic air cargo terminal facility
Reference: Photovoltaic power generation facilities of our company
Construction completed in
March 2014
Name of facility
Kagoshima Airport Hangar No.1, Hangar No.2, and warehouse
Location
Kagoshima Airport
Annual power generation
Approx. 300,000 kWh
Annual reduction of CO2 emissions*
Approx. 140t
Construction completed in
January 2018
Name of facility
TRC Distribution B Building Rooftop Solar Power Plant
Location
Ota-ku, Tokyo
Annual power generation
Approx. 2.56 million kWh
Annual reduction of CO2 emissions*
Approx. 1,250t
Construction completed in
December 2020
Name of facility
Haneda Airport Domestic Cargo Terminal (rooftop)
Location
Haneda Airport
Annual power generation
Approx. 1.19 million kWh
Annual reduction of CO2 emissions*
Approx. 580t
Construction completed in
May 2023
Name of facility
Seletar Airport, Singapore Engine maintenance Building
Location
Seletar Airport, Singapore
Annual power generation
Approx. 480,000 kWh
Annual reduction of CO2 emissions*
Approx. 230t
Construction completed in
November 2024
Name of facility
Haneda Airport Engine Maintenance Building South Wing
Location
Haneda Airport
Annual power generation
Approx. 120,000 kWh
Annual reduction of CO2 emissions*
Approx. 60t
Construction completed in
November 2024
Name of facility
Haneda Airport Components Maintenance Building
Location
Haneda Airport
Annual power generation
Approx. 60,000 kWh
Annual reduction of CO2 emissions*
Approx. 30t
Construction completed in
December 2024
Name of facility
Seletar Airport, Singapore Airbus Asia Training Centre
Location
Seletar Airport, Singapore
Annual power generation
Approx. 680,000 kWh
Annual reduction of CO2 emissions*
Approx. 330t
Construction completed in
December 2024
Name of facility
Kobe Airport Hangar (extension building)
Location
Kobe Airport
Annual power generation
Approx. 190,000 kWh
Annual reduction of CO2 emissions*
Approx. 90t
*: CO2 reduction = 0.489 (CO2/kWh)
(Conversion factor based on the periodic report according to the Tokyo Metropolitan Environmental
Security Ordinance)