Business summary

Utilization of clean energy is a first step towards realizing a sustainable society. AFC is making efforts in the Renewable Energy Business, utilizing the rooftops of facilities in and outside the airport as well as idle land. The company first installed a solar power generation plant in Narita City, Chiba Prefecture in 2013. Since then, power generation facilities have been installed on the rooftop of a hangar in Kagoshima Airport, on idle land in Mizunami City, Gifu Prefecture, and on the rooftop of a logistics building in Ota-ku, Tokyo, and became able to generate about 5.2 million kWh a year, equivalent to electricity consumption for about 1,370 households. In December 2020, photovoltaic a power generation panel was installed on the rooftop of a cargo facility in Haneda Airport, generating 1,195,000 kWh a year. Electricity generated is self-consumed within the airport, realizing energy production for local consumption. We will continuously contribute to achieving the SDGs through the utilization of renewable energy.

Introduction of business

Installing megawatt-class photovoltaic power generation facility in Haneda Airport

Megawatt-class photovoltaic power generation panels are installed in the domestic cargo terminal of our company.
We are introducing clean energy by generating electricity equivalent to the consumption of 270 households annually, and self-consume the electricity generated within the area.

A photovoltaic power generation facility owned by our company annually generates electricity equivalent to about 3,100t emission of CO2 in total. We will continuously contribute to the reduction of CO2 emission through investment in renewable energy.

Domestic air cargo terminal facility
Domestic air cargo terminal facility

Reference: Photovoltaic power generation facilities of our company

Construction completed in
October
2013
Name of facility
Honsanrizuka Solar Power Plant
Location
Narita City, Chiba Prefecture
Annual power
generation
Approx. 800,000 kWh
Annual reduction of CO2 emissions*1
Approx. 390t
Construction completed in
March
2014
Name of facility
Kagoshima Airport
Hangar No.1, Hangar No.2, and warehouse (rooftop)
Location
Kagoshima Airport
Annual power generation
Approx. 300,000 kWh
Annual reduction of CO2 emissions*1
Approx. 150t
Construction completed in
January
2016
Name of facility
Gifu Mizunami Solar Power Plant
Location
Mizunami City, Gifu Prefecture
Annual power generation
Approx. 1.6 million kWh
Annual reduction of CO2 emissions*1
Approx. 780t
Construction completed in
January
2018
Name of facility
TRC Distribution B Building Rooftop Solar Power Plant
Location
Ota-ku, Tokyo
Annual power generation
Approx. 2.5 million kWh
Annual reduction of CO2 emissions*1
Approx. 1,220t
Construction completed in
December
2020
Name of facility
Domestic Cargo Terminal (rooftop) of Haneda Airport
Location
Haneda Airport
Annual power generation
Approx. 1.2 million kWh
Annual reduction of CO2 emissions*1
Approx. 590t
Construction completed in
May 2023
Name of facility
the engine plant(rooftop) in Seletar airport, Singapore
Location
Seletar airport, Singapore
Annual power generation
Approx. 457,000 kWh
Annual reduction of CO2 emissions*1
Approx. 190t*2

*1: CO2 reduction = 0.489 (CO2/kWh)
(Conversion factor based on the periodic report according to the Tokyo Metropolitan Environmental Security Ordinance)
*2: CO2 reduction = 0.416(CO2/kWh)
(Conversion factor based on Singapore's Operating Margin Grid Emission Factor)